Project Duration 4 MONTHS. SCD processed and removed in excess of 3,000 tonnes of steel and non-ferrous materials from Cleveland Bridge in Darlington. SCD co-ordinated
Project Duration 4 MONTHS.
SCD processed and removed in excess of 3,000 tonnes of steel and non-ferrous materials from Cleveland Bridge in Darlington.
SCD co-ordinated with various contractors on site to deliver a bespoke and dynamic programme safely removing several overhead cranes both inside and outside of the buildings on site.
All materials were processed on site ready for removal in a cost effective manner.
Several contract lifts were made to safely and pragmatically dispose of redundant lifting equipment and work shop assets.